Where cushion tee needed on piping?
asked
Apr 25, 2015
in
Piping
by
odadmin
(
21,030
points)
tee
Please
log in
or
register
to add a comment.
Please
log in
or
register
to answer this question.
1 Answer
+1
vote
answered
May 7, 2015
by
MS
(
1,090
points)
|
selected
May 7, 2015
by
odadmin
Best answer
Cushion tees are added on piping where sand is expected and the elbow is angle below 90ยบ
commented
May 7, 2015
by
odadmin
(
21,030
points)
Thank you for answering my question
Please
log in
or
register
to add a comment.
Related questions
1
answer
Temporary support for structure design to enable the replacement of elastomeric bearings when needed on FPSO?
asked
Jul 2, 2014
in
Structural-Civil
by
wozniakmic
(
3,460
points)
module
structure
support
bearing
fpso
1
answer
What is the recommended installation sequence for CRA and Carbon Steel piping?
asked
Nov 4, 2014
in
Piping
by
cchang219
(
2,310
points)
cra
1
answer
Piping previously used for heavy fuel oil (HFO) NOT to be used for diesel service and be replaced?
asked
Jul 13, 2014
in
Piping
by
cuchiang
(
2,310
points)
piping
heavy
fuel
1
answer
Can the mentioned table be used for Marine Piping Systems as well?
asked
Jul 8, 2014
in
Piping
by
belmoreno
(
2,190
points)
1
answer
UOE Process requirement for tendon piping?
asked
Jul 8, 2014
in
Piping
by
belmoreno
(
2,190
points)
tendon
pipe
uoe
Ask a Question
All categories
Engineering
(544)
Process
(159)
Simulation
(15)
Calculation
(5)
Material
(48)
E&I
(36)
Mechanical
(54)
Piping
(23)
Flow Assurance
(14)
Safety
(37)
Structural-Civil
(9)
Geology
(1)
Offshore-Upstream
(188)
Downstream-Midstream
(3)
Quality Assurance
(9)
Commercial
(10)
Procurement
(2)
Others
(15)
Most popular tags
fpso
valve
riser
pump
subsea
compressor
psv
flare
heat-exchanger
pressure
drilling
relief
corrosion
sour
tank
...