1 Answer

0 votes
answered Dec 16, 2015 by JanineBennin (685 points)
Use alternative options possible (e.g. relocate pile, use drag anchor, use drop anchor, use jetty conductor, use hammer conductor).

Also evaluate soil conditions for the use of suction piles in the planning stage to avoid the what-if scenarios.
...