Yes, the FPSO Contractor should perform a pre‐installation ROV survey of the seabed in the vicinity of the positions at which the Mooring legs (piles and lines) will be installed and wet stored. The Mooring legs deployment will be performed in continuity of this pre‐installation ROV survey (same offshore campaign).
Debris removal or cleaning of site (no obstruction on abandonment corridor) may or may not be included.