0 votes
36 views

Do operating company take over the equipment at the end of the FPSO installation?

asked May 31, 2014 in Installation by pasmith (3,320 points)
Do operating company take over the equipment (i.e. empty reels) at the end of the FPSO installation?

1 Answer

0 votes
answered May 31, 2014 by gagonza (3,020 points)
In order to optimize the offshore installation duration and reduce number of port call, operating company should take control of the equipment for subsequent care and transportation to land at the end of the installation campaign.
...