Is FPSO Contractor responsible for installation and pre-commissioning of the FTL?

asked Jun 1, 2014 in Installation by pasmith (3,320 points)
Is FPSO Contractor responsible for installation and pre-commissioning of the Fluid Transfer Line (FTL) and FTL's umbilical?

1 Answer

0 votes
answered Jun 1, 2014 by gagonza (3,020 points)
In my opinion, FPSO Contractors are typically not responsible for installing or performing pre-commissioning of the FTL or FTL's related equipment.
...