How long Gas Flaring shall be allowed after a production shutdown on an offshore facility?

asked Jun 25, 2014 in Operations by antonjoh (2,870 points) | reshown Jun 26, 2014 by Normandy
How long Gas Flaring shall be allowed after a production shutdown on an offshore facility whether a FPSO or a conventional platform?

1 Answer

+1 vote
answered Jun 25, 2014 by sabdullayev (5,290 points) | reshown Jun 26, 2014 by Normandy
 
Best answer

Gas flaring is typically allowed for up to 8 hours following a production shutdown or after the commissioning of topsides has been completed and during the operation of the topsides. Hoverer, the limit of 8 hours flaring shall not be applied during the initial start up of the topside facilities.

...