0 votes
74 views

Reserve of water ballast greater than 5% of the TLP payload condition?

asked Jul 8, 2014 in Hull by belmoreno (2,190 points)
Is it acceptable as an industry practice to request the contractor to design the TLP Hull with a Ballast Reserve of Water with at least 5% or more of the worst payload condition?

1 Answer

0 votes
answered Jul 8, 2014 by cuchiang (2,310 points)
That design requirement will certainly add extra cost and weight to TLP hull. That is an extremely conservative percentage, which will result in increased hull size and steel to support the ballast water.

The design requirement should be following Class and regulations.

It is generally industry practice to recommend a fixed ballast reserve, instead of the fixed percentage of TLP displacement.
...